Fire-protection coatings on structural steelwork. Multi-storey car parks, warehouse frames, bridge work and exposed beams. Specced, primed, applied to thickness, signed off against your building-control pack.
Specced, scheduled, paperwork on the day, signed off against your spec sheet. Out-of-hours where the site demands it.
We work to manufacturer DFTs, off the structural drawings or the FE schedule. Wet-film and dry-film checks logged every coat so the certs back up the inspection.
Shot-blast, jet-wash or hand prep to the prep grade your spec demands. Galvanised, painted, or rusted steel each get the right primer pulled forward of the intumescent layer.
High-volume steel structures sprayed in sequence with the build programme. We work alongside the contractor, not against him, and keep the lifts moving.
Highways and rail structures coated to client spec. Out-of-hours possessions, RAMS to whichever framework your principal contractor reports against.
Questions we get on most intumescent coatings enquiries before pricing.
Same team, same paperwork, different scope. One contractor across the building.
Most enquiries start with a five-minute call to confirm scope, sector and shutdown window. Drawings or schedules ideal but not essential to get a price moving.
Quickest by phone or WhatsApp with a photo. Or send the form and we will be back with a price and a programme inside 48 hours.